







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Ameristar Driveway & Pavers: The Thousand Oaks Owner’s Guide
Ameristar driveway and paver replacement in Thousand Oaks typically falls between $4,500 and $18,000 installed, depending on whether you’re repairing a section or replacing the full run. We keep common Ameristar-compatible pavers, edging, base rock, and joint sand on our trucks, so most Thousand Oaks jobs start the same week you call. Most homeowners discover the problem after a heavy rain in the Conejo Valley, when a paver sinks, a section of edging pulls loose, or a cracked unit begins to migrate toward the street.
You’re not alone in this. Ameristar products show up across Thousand Oaks, from the cul-de-sacs near Lynn Ranch to newer builds off Avenida de los Arboles. When one part fails, the surrounding system usually gets stressed within a season, which is why we quote the repair and the adjacent stabilization work together.
Which Ameristar Models This Applies To

Ameristar’s driveway and paver lines include interlocking concrete pavers, perimeter edge restraints, polymer sand joints, and the compacted base aggregate layer beneath the units. The brand’s concrete paver units run in standard formats: 4×8, 6×9, and 8×8 inches across most residential lines, with thickness ranging from 60mm (about 2.36 inches) for pedestrian patios up to 80mm (about 3.15 inches) for driveway-rated traffic. If your paver is 60mm thick and you’re parking a full-size truck on it, that mismatch is likely the root of your failure.
You can identify your Ameristar paver by checking the underside for a raised production stamp, the paver’s actual measured thickness, and the color code printed on the original box if you still have it. The gotcha: Ameristar units change color batch-to-batch, so matching a ten-year-old paver to a new one often requires blending units from two batches. We carry a range of Ameristar-compatible pavers and can order exact matches through our hardscape supply partners like Belgard and Unilock when needed. One honest note: Mason Remodeling Co Thousand Oaks is an independent service provider, not affiliated with Ameristar, and we’ll tell you plainly when an aftermarket equivalent is just as good as the OEM unit, and when it isn’t.
Styles & brands we work with







Signs Your Ameristar Driveway & Pavers Is Failing
Here’s what we see most on Thousand Oaks driveways, and what each symptom actually tells us about the base or the units:
- Sunken pavers, especially near the garage apron. The base rock under the Ameristar pavers is losing compaction, usually because water from the driveway slope is eroding the fines. This happens a lot in Thousand Oaks where driveways pitch toward the house instead of the street.
- Edge units spreading into the lawn or planter bed. The plastic or steel edge restraint has pulled loose or was never spiked deeply enough. Once the outer course moves, every course behind it follows.
- Joint sand washing out after rain. This means the sand wasn’t properly compacted into the joints or the wrong sand was used originally. You’ll see small pools of sand at the driveway’s low point after every storm.
- A single cracked paver near a vehicle tire line. That’s a thickness issue or a void under the unit. If a 60mm patio paver was used in a driveway traffic area, repeated vehicle weight will crack it, usually at the mid-span where there’s no support underneath.
- Weed growth through the joints in straight lines. Small weeds mean sand is depleted. Straight-line weeds mean the base layer has cracked and roots are following the fault line under the pavers. It’s a base failure, not a cosmetic problem.
See the difference
Before
After
Before
After
Before
AfterReplacement Cost & What’s Included

For full Ameristar-style paver driveway replacement in Thousand Oaks, we quote between $7,000 and $18,000. The range depends on total square footage, access for equipment, whether the existing base can be salvaged, and whether we’re pulling a concrete slab out first. A paver patio rerun in the same brand runs $3,500 to $11,000.
If you just need a repair section reset, most Thousand Oaks jobs land between $800 and $2,500 for pulling up the affected pavers, recompacting the base, adding fresh base rock if needed, reinstalling the units, and locking in new polymer sand. Full replacement includes demolition and haul-off of the old surface, base prep, Ameristar-compatible paver install, edge restraint, joint sand, and a final compaction pass. You’ll get a written price before any work starts, and the work is covered by our 365-Day Done Right Promise. If something isn’t right within a year of completion, we come back and make it right at no cost.
DIY or Call Us?
A homeowner can handle two checks without risk: look for the thickness stamp on the underside of a loose paver, and test whether the edge restraint is still spiked into the soil. Those two facts tell you a lot about what’s actually wrong.
Where DIY goes sideways is in lifting driveway pavers without pulling the edge restraint first, which cracks adjacent units; mixing new polymer sand into old, contaminated sand; and reusing base rock that has lost its fines. A paver driveway is a system, and if the base isn’t right, the surface will fail again within a season. That’s the repair we quote most in Thousand Oaks. If you’d rather have it done once and not think about it again, call (805) 309-3386 for a free estimate. Tell me what you need done. We’ll tell you what it costs and how long it takes, then we’ll do exactly that.
FAQs

Installed properly with an 80mm paver over a compacted base, an Ameristar driveway in Thousand Oaks should last 25 to 30 years before the units themselves fail. The sand joints and edge restraints typically need service every 3 to 5 years because our wet-dry Conejo Valley climate works the sand loose faster than inland areas. Call (805) 309-3386 and we’ll assess your current setup and give you a straight answer on what’s wearing and why.
Yes, in most cases we can lift and reset the affected pavers, recompact the base, and install fresh joint sand without touching the rest of the driveway. It works best when the base layer is still solid and the issue is localized. If the base is failing across a wide area, a repair will buy you time but won’t hold as long as a proper replacement. Call (805) 309-3386 for a free estimate and we’ll tell you which situation you’re in.
Most single-section repairs in Thousand Oaks take one to two days, including base recompaction and joint sand. A full driveway replacement typically runs four to seven working days, depending on overall size and whether we’re removing an old concrete slab or just the old pavers. We give you a written timeline with the written price, so you’ll know both before we start.
We keep common Ameristar-compatible paver sizes, edge restraint, base rock, and polymer sand on our trucks, which handles most Thousand Oaks repairs the first day. For exact batch matches or large full-run replacements, we order through our hardscape partners like Belgard and Unilock, and we also stock parts for KraftMaid, Cambria, and Silestone for interior work. Call (805) 309-3386 and we’ll check current stock and match availability before you commit.
Contact Mason Remodeling Co Thousand Oaks: Call (805) 309-3386 for a free, written estimate on your Ameristar driveway or paver repair in Thousand Oaks. A live person answers every call, 24/7. You’ll get a written price before any work begins and a name-and-photo introduction to the technician before they arrive.
Written by Isaac Pruett, Owner, Mason Remodeling Co – Thousand Oaks, CA at Mason Remodeling Co Thousand Oaks, serving Thousand Oaks and nearby areas.


